Xem mẫu
- Automation and Drives
SIMATIC
S7-300
Workshop to promote the S7-300
automation platform
A&D AS SM6, Page 1
- Automation and Drives
SIMATIC S7 system family
Positioning / S7-400
Range
High-end and mid performance range
Innovation S7-300
Large quantitative framework
Synchronism High performance in communication throughput
Roadmap
S7-300
Mid and low-end performance range
Max. of 2 interfaces (field bus, cell bus)
Medium performance in throughput
S7-200
Low-end performance range
A&D AS SM6, Page 2
- Automation and Drives
S7-300 - Memory, performance and quantitative framework
312 314 315-2DP 317-2DP 317- 2PN/
Positioning /
Range DP
Innovation S7-300 Main memory 16 KB 48 KB 128 KB 512 kB 512 kB
Synchronism Instructions 5k 16 k 42 k 170 k 170 k
Roadmap Load memory 8 MB 8 MB 8 MB 8 MB 8 MB
Command runtimes
200 ns 100 ns 100 ns 100 ns 100 ns
- Binary commands
1 µs 0,5 µs 0,5 µs 0,1 µs 0,1 µs
- Word commands
30 µs 15 µs 15 µs 4 µs 4 µs
- Floating-point c.
6 12 16 32 32
Comm. res.
1k 2k 16 k 32 k 32 k
Flags
128 / 128 256 / 256 256 / 256 512 / 512 512 / 512
Times / Counters
1024 1024 2048 8192 8192
Address space I/O 256 1024 1024 1024 1024
No. of digital chan. 64 / 64 256 / 256 256 / 256 256 / 256 256 / 256
No. of analog
channels I/O Objectives
A&D AS SM6, Page 3
- Automation and Drives
S7-300 Innovation - Overview
Quantitative framework
Positioning /
Range Doubling of memory
Innovation S7-300
Flags, timers, counters
Performance Processing speed
Communication 4 x faster binary processing
Miscellaneous 2 - 10 x faster floating-point
commands
Synchronism
Roadmap Communication performance
100 Mbaud Ethernet
up to 16 communications resources
Communication paths
PROFIBUS DPV1
PROFInet / CbA
Technology platform
Controlling, counting, positioning
A&D AS SM6, Page 4
- Automation and Drives
Innovations - Features and benefits (I)
High processing speed
Positioning
/ Range
4x faster processing of binary word commands
Innovation S7-300
10x faster floating-point arithmetic
Performance
Increased system reaction time
Communication
Miscellaneous
Synchronism
Roadmap How does the customer benefit?
Performance-enhanced execution of user applications
Particularly advantageous in motion control tasks and closed-
loop control
Increased machine cycle times and throughput as a
result of shorter program execution times
A&D AS SM6, Page 5
- Automation and Drives
Innovations - Features and benefits (II)
The extended quantitative
Positioning / framework
Range
Innovation S7-300
Main memory doubled
Performance
Communication Operating hours counter
Miscellaneous
Synchronism Timers / Counters
Roadmap
Flags
Greater range of numbers
Makes plant innovation possible while
retaining the CPU
A&D AS SM6, Page 6
- Automation and Drives
Innovations – Extended quantitative framework
What are the benefits to the customer?
Positioning Additional resources for the user program
/ Range
Greater use of engineering tools
Innovation S7-300
Memory requirements
Performance
Communication
Miscellaneous
Synchronism
Roadmap
Productivity
Portable from the smallest S7-300 to the largest S7-400
Better, modular and reusable programming
Greater use of IEC 61131-3 high-level programming
languages
Manufacturer-independent programming
Lower engineering costs and fewer programming
errors through the use of engineering tools
A&D AS SM6, Page 7
- Automation and Drives
Innovations – Extended quantitative framework
How does the customer benefit?
Positioning /
Range Additional resources for runtime software
Innovation S7-300
Performance
Communication
Miscellaneous
Synchronism
Roadmap
Solutions for technology tasks
as runtime software
A&D AS SM6, Page 8
- Automation and Drives
Innovations – Extended quantitative framework
Programming with STEP 7 (from V5.1 SP4)
Positioning
/ Range The well-known tool for all functions and
Innovation S7-300 applications
Performance
Communication
Programming with STEP 7 Lite
Miscellaneous
The new programming package for
Roadmap
basic functions for simple stand-
alone applications
Features of STEP 7-Lite
Rapid familiarization due to intuitive working
Simpler project handling (project = CPU)
Migration i.e. data import into STEP 7 possible
A&D AS SM6, Page 9
- Automation and Drives
Innovations – Extended quantitative framework
How does the customer benefit?
Positioning /
Range Additional resources for diagnostic software
Innovation S7-300 System diagnosis
Performance
Error diagnosis from the CPU up to the I/O
Communication
Internal CPU services (e.g. error messages with time stamp)
Miscellaneous
Synchronism Process diagnosis
Roadmap Critical process signals are monitored by a program
Easy planning with S7-PDIAG and ProAgent
Automatic alarms from CPU to HMI device
Optimized fault analysis reduces downtimes
and increases productivity
A&D AS SM6, Page 10
- Automation and Drives
Innovations - Features and benefits (III)
Increased communication performance /
Positioning /
Range
improved openness
Innovation S7-300
Performance
15 OPs or active connections
Communication
Support of PROFIBUS DPV1 standard
Miscellaneous
Synchronism
How does the customer benefit?
Roadmap
Greater degree of networking at the cell level
Increased data exchange with MES/ERP systems
Detailed error information from non-Siemens field devices
makes finding errors easier
Reduced downtimes
Flexible optimization of field devices during operation
Reduced product changeover times
A&D AS SM6, Page 11
- Automation and Drives
Innovations - Features and benefits (IV)
SIMATIC Micro Memory Card
Positioning /
Range Flexible choice of memory size 64 KB – 8 MB
Innovation S7-300 Restoring and back-up of data in RUN
Performance STEP 7 project storage
Communication Data are retained without a battery
Miscellaneous
Synchronism
Roadmap How does the customer benefit?
Maintenance-free
Comments and symbols already on CPU in case
servicing is required
Time-savings
New ways of archiving data and managing recipes
Reduced acquisition costs
A&D AS SM6, Page 12
- Automation and Drives
Innovations - Features and benefits (V)
Compact design
Positioning /
Range Reduced size for new CPUs
Innovation S7-300 Higher channel density for analog output module
Performance
Communication
Miscellaneous
Synchronism
Roadmap
How does the customer benefit?
Saves space in the control cabinet
A&D AS SM6, Page 13
- Automation and Drives
Clock synchronized and Equidistance
Positioning /
Timing cycles without synchronism
Range
Innovation S7-300 T4
Synchronism Many cycles uncoordinated
T1: Read in input signal
Roadmap
T2: Backplane bus distributed I/O
T3: PROFIBUS DP
T3 T5
T4: CPU program cycle
T5: PROFIBUS DP
T6: Backplane bus distributed I/O
T2 T6
T7: Output signal
T1 T7
The reaction time is the sum of all times (T1 to T7)
The output accuracy is the sum of the times from the
CPU to the output (T4 to T7)
A&D AS SM6, Page 14
- Automation and Drives
Clock synchronized and equidistance
Timing cycles with Clock synchronized
Positioning /
Range
Innovation S7-300
Constant time System cycle Constant time
Synchronism for sampling for outputting
Roadmap inputs outputs
Coordinated times in a fixed system cycle
Reaction time ≤ 2 * system cycle
Using new output modules the accuracy can be
increased to approx. 50 µs
The time of output is known exactly
A&D AS SM6, Page 15
- Automation and Drives
Clock synchronized and equidistance
How does the customer benefit?
Positioning /
Range Equidistant actual value acquisition and set value output
Innovation S7-300 Precise time-based calculations (e.g. rotational speed)
Synchronism
Motion control applications become more precise
Roadmap
Control loops also possible via distributed I/O
Input and output of synchronous signals
Consistent I/O image via PROFIBUS line
Reaction times of inputs and outputs are constant and
known
Signals coupled close in time can be distributed
Objective: Max. 200 µ s jitter through the complete system
Increased machine cycle times
Reduced machine expansions
A&D AS SM6, Page 16
- Automation and Drives
Planning of stages of further development of S7-300
Positioning /
Range SEP OCT NOV DEC SEP OCT NOV DEC
Innovation S7-300
2001 2002 2003
Synchronism
Roadmap 312
2. Step
312C 317- 2 PN/DP
314
313C
S7-300 Compact
315- 2DP
313C - 2 PTP
S7-300 (new)
S7-300 (new)
313C - 2 DP
step 1A
step 1B
314C - 2 PTP
314C - 2 DP
A&D AS SM6, Page 17
- Automation and Drives
SIMATIC S7-300 CPU range
S7-300
High End
Positioning /
Range 317- 2 PN/DP - 512k
PN (Ethernet), DP
Performance
Innovation S7-300 S7-300
Memory
Mid Range 317- 2 DP - 512k
Synchronism Communication MPI/DP, DP
Roadmap
Based on 314C
315- 2 DP - 128k
MPI, DP
314 - 48k
MPI
ca. 2800 - 3050 €
500 - 1250 €
S7-300
Compact Class
312 - 16k
MPI
Price
S7-300 345 - 1.360 €
Low End 260 €
A&D AS SM6, Page 18
- Automation and Drives
The universal automation platform for
discrete manufacturing
SIMATIC
S7-300
designed for
Totally Integrated
Automation
A&D AS SM6, Page 19
nguon tai.lieu . vn