This study aims to investigate all papers published on the application of optimization in the project management from 1940 to 2019 and shows: a) how the trend has changed over this 79 years period, b) to what direction the trend has changed, c) determines the interesting topics of the recent years, and d) which subjects are more attractive as future studies as the applications of the optimization techniques in the project management.
6/18/2020 4:08:26 AM +00:00
The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks.
6/18/2020 4:08:20 AM +00:00
In this paper, an exponential function is considered for synergistic impact of the projects that make the problem more similar to the real-world problems. An illustrative example is used to demonstrate the appropriate application of the proposed model.
6/18/2020 4:08:14 AM +00:00
This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Sco-pus database as a primary search engine and covers 3370 records over the period 1963-2019.
6/18/2020 4:08:08 AM +00:00
This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia.
6/18/2020 4:08:02 AM +00:00
In this article, by choosing agriculture sector as a case study, an attempt has been made to study the evaluation, ranking and management of projects with investment classifying strategy of the projects using Delphi, TOPSIS and AHP methods.
6/18/2020 4:07:56 AM +00:00
This paper addresses the stochastic permutation flow shop problem (SPFSP) in which the stochastic parameters are the processing times. This allows the modeling of setups and machine breakdowns.
6/18/2020 4:07:50 AM +00:00
The main objective of this paper is to identify various causes of occurrence of blowholes and recommend corresponding remedies to counter these defects by systematic implementation of DMAIC cycle.
6/18/2020 4:07:43 AM +00:00
This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process.
6/18/2020 4:07:37 AM +00:00
This paper determines a hybrid renewable energy source (HRESs) for a rural community using technical, economic, and techno-economic criteria.
6/18/2020 4:07:31 AM +00:00
An integrated hybrid Fuzzy Inference System-Latin Hypercube Simulation for the evaluation of OHS risks in construction projects is presented in this paper. Prioritization of safety risks systematically without human interference with fuzzy inference system gives the appropriate response to the identified risks.
6/18/2020 4:07:25 AM +00:00
The purpose of this research is to gather some date from experts using some questionnaires in the area of project management to build an information modeling. The study determines that each of the basic BIM capabilities had positive effects on different domains of PMBOK knowledge.
6/18/2020 4:07:19 AM +00:00
In this paper, investigations are carried out for the multi-objective scheduling of AGVs to simultaneously balance the workload of AGVs and to minimize the travel time of AGVs in the FMS.
6/18/2020 4:07:13 AM +00:00
This paper presents a review of human resource planning methods, related techniques, and their effects on cellular manufacturing systems (CMS). In-depth analysis has been conducted through a review of 43 dominant research papers available in the literature.
6/18/2020 4:07:07 AM +00:00
In this paper, 996 airplane maintenance basis data are used as a database, and 119 similar data are chosen after clustering. The project is divided into 20 equal periods and first three periods are used for simulating the next point.
6/18/2020 4:07:01 AM +00:00
This study attempts to find out how organizations ought to be managed to take full advantage of PMS tools. This study uses a comprehensive questionnaire to find all critical factors influencing on the success of the organization.
6/18/2020 4:06:54 AM +00:00
This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT) and expert views as fuzzy numbers.
6/18/2020 4:06:48 AM +00:00
This study presents a framework that combines techno-economic requirements as a means for evaluating the important retrofitting criteria and suitable lighting retrofit technologies for building projects.
6/18/2020 4:06:42 AM +00:00
The paper focuses on the application of TODIM (TOmada de Decisao Interativa Multicriterio), which means in Portuguese ‘interactive and multi-criteria decision making’) method in identifying the most attractive and affordable under-construction housing project in the city of Kolkata in India.
6/18/2020 4:06:36 AM +00:00
In this article, a hybrid decision making method is used to prioritize construction project portfolio by considering sustainability criteria. First, Lexicographic method is applied to weight the sustainability criteria.
6/18/2020 4:06:30 AM +00:00
This paper attempts to evaluate 4 dumping areas based on 5 criteria. Analytical hierarchy process (AHP) is used to determine the weighs for each criterion and quality function deployment (QFD) is also implemented.
6/18/2020 4:06:24 AM +00:00
This study examines the properties of the downward-sloping region of the linear supply function equilibrium (cartel case), which has not been considered in the literature. In simple duopoly settings, we find two regions, depending on the cartel type.
6/18/2020 4:06:18 AM +00:00
In this paper, a literature review between 1987 and 2018 on different issues affecting the sustainability in project management is carried out.
6/18/2020 4:06:12 AM +00:00
The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs.
6/18/2020 4:06:06 AM +00:00
A search engine is an essential tool in our daily life. With the development of society and network technology, the users’ requirement of Internet information is increasing. For most search methods, keyword searching is in a crucial position. However, what about the quality of keyword search in different search engines? This paper evaluates the quality of keyword searching among different search engines project.
6/18/2020 4:06:00 AM +00:00
In recent years, clients often employ multiple contractors to implement different activities of the projects. Each contractor manages and implements a subset of activities according to the determined schedule and payments.
6/18/2020 4:05:54 AM +00:00
This paper presents a multi-criteria decision making method for contractor selection. The proposed study uses six criteria, namely; Experience, Financial stability, Quality performance, Manpower resources, Equipment resources and Current workload for evaluating different contractors.
6/18/2020 4:05:48 AM +00:00
In this research, we try to investigate the relationship between the complexity of the project and the merits of the project manager by applying a structural equation modeling approach.
6/18/2020 4:05:42 AM +00:00
This paper considers the dynamic variant of single processor scheduling problem of minimizing total tardiness. In practice, it occurs when minimizing tardiness penalty. The problem is NP-hard; thus two heuristics were proposed.
6/18/2020 4:05:36 AM +00:00
This study presents an adaptive algorithm for performance assessment of project management with respect to resilience engineering and job security in a large construction site.
6/18/2020 4:05:30 AM +00:00