Tài liệu miễn phí Quản lý dự án

Download Tài liệu học tập miễn phí Quản lý dự án

Lecture Project management: A managerial approach – Chapter 9: Resource allocation

For single projects, we discuss how the resource allocation problem concerns resource leveling to minimize the cost of the resources. But for multiple projects, we learn that the issue is how to allocate limited resources among several projects in order to achieve the objectives of each.

6/18/2020 6:29:15 AM +00:00

Lecture Project management: A managerial approach – Chapter 8: Scheduling

Scheduling, a crucial aspect of project planning, is then described in Chapter 8, along with the most common scheduling models such as the Program Evaluation and Review Technique (PERT), the Critical Path Method (CPM), and precedence diagramming.

6/18/2020 6:29:09 AM +00:00

Lecture Project management: A managerial approach – Chapter 7: Budgeting: estimating costs and risks

In chapter 7, we will see that the distinction between these types of life cycles plays a critical role in developing budgets and schedules for projects. It is not necessary for the PM to estimate the precise shape of the life-cycle curve, but the PM must know which type of project life cycle applies to the project at hand.

6/18/2020 6:29:03 AM +00:00

Lecture Project management: A managerial approach – Chapter 6: Project activity and risk planning

Chapter 6 deals with project activity planning and presents tools useful in organizing and staffing the various project tasks. It also contains a short discussion of phase-gate management systems and other ways of dealing with the problems that arise when multidisciplinary teams work on complex projects.

6/18/2020 6:28:57 AM +00:00

Lecture Project management: A managerial approach – Chapter 5: The project in the organizational structure

Chapter 5 discusses various ways to establish the project organization. Different organizational forms are described, as well as their respective advantages and disadvantages. The stafffi ng of the project team is also discussed.

6/18/2020 6:28:51 AM +00:00

Lecture Project management: A managerial approach – Chapter 4: Managing conflict and the art of negotiation

Chapter 4 covers a subject of critical importance to the PM that is almost universally ignored in project management texts: the art of negotiating for resources. The chapter also describes some major sources of interpersonal confl ict among members of the project team.

6/18/2020 6:28:45 AM +00:00

Lecture Project management: A managerial approach – Chapter 3: The project manager

Chapter 3 concerns the many roles of the project manager (PM), the multiple responsibilities, and some personal characteristics a project manager should possess. It also discusses the problems a PM faces when operating in a multicultural environment.

6/18/2020 6:28:39 AM +00:00

Lecture Project management: A managerial approach – Chapter 2: Strategic management and project selection

Chapter 2 describes how to evaluate and select projects that contribute to the organization’s strategy and discusses the information needed as well as the management of risk during this process. The chapter concludes with a description of an eight-step procedure called the “project portfolio process” that aligns project selection with the strategy.

6/18/2020 6:28:33 AM +00:00

Lecture Project management: A managerial approach – Chapter 1: Projects in contemporary organizations

After studying this chapter you will be able to understand: What is a project? The importance of project management, comparison of routine work with projects, the challenge of project managementproject management today - an integrative approach,...

6/18/2020 6:28:27 AM +00:00

Vanishing Heritage: Values of Wooden Minaret Mosque Brezovača

This paper aims to explain values of wooden minaret mosque of Bosnia. Furthermore, case study of Brezovača mosque located in northern part of the county was elaborated and the aim of this paper was to justify need to regain original shape and to explain proposed interventions relaying on similar structure from the close vicinity.

6/18/2020 5:21:31 AM +00:00

The Journal of Architecture, Planning and Construction Management

It aims to report current research work and latest development in the specialized areas of architecture, landscape architecture, applied arts and design, urban and regional planning, quantity surveying, building technology and engineering, construction management and other scholarly works related to the built environment.

6/18/2020 5:21:25 AM +00:00

Determinants of the construction investment project management performance: Evidence at Vietnam small and medium sized enterprises

The objective of this study is to identify factors affecting the performance of the construction investment project management in Vietnam. The author conducted a survey at 458 small and medium sized enterprises in Hanoi, Da Nang and Ho Chi Minh City.

6/18/2020 4:10:32 AM +00:00

Risk management and risk management performance measurement in the construction projects of Finland

The objective of this study is to analyze the risk management (RM) and risk management performance measurement (RMPM) through an in-depth empirical analysis of two complex construction projects of Finland.

6/18/2020 4:10:26 AM +00:00

Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management

The purpose of this paper is to present a method for predicting project duration and cost of the project and selecting the best action plan. Control charts are used along with the earned value management method to increase accuracy.

6/18/2020 4:10:20 AM +00:00

Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman

This paper investigates the main time delay and cost overrun causes in construction projects within Oman related to clients, contractors, and consultants.

6/18/2020 4:10:02 AM +00:00

Portfolio scheduling: an integrative approach of limited resources and project prioritization

This paper goes one step further and presents an algorithm that solves the RCMPSP where each project has a different priority for the organization. With this information, the algorithm uses a market-based mechanism to determine what activities should receive preferential treatment during the scheduling process.

6/18/2020 4:09:56 AM +00:00

A survey in the resource-constrained project and multi-project scheduling problems

This paper surveys studies of RCPSPs and RCMPSPs under consideration of four categories of project activities, simply recorded as categories A, B, C, and D. Category A refers to activities can be performed using fixed resources along The Y-axis over fixed durations along The X-axis, and cannot be interrupted

6/18/2020 4:09:50 AM +00:00

Projects portfolio determination based on key stakeholders’ expectations and requirements: Evidence from public university projects

The thematic, spatial and temporal objects of the research were to analyze the stakeholders and projects portfolio determination based on key stakeholders of a public university in Iran in 2019.

6/18/2020 4:09:44 AM +00:00

Selecting a portfolio of projects considering both optimization and balance of sub-portfolios

This study employs data-mining tools to categorize projects into sub-portfolios and rank them. Multiple Criteria Decision Making (MCDM) methods are also used to weigh the criteria on which the ranking process is based.

6/18/2020 4:09:38 AM +00:00

Impact of supply chain risks on the completion for time of rural road projects in Bangladesh

This study focuses on nine risk factors specifically in case of Bangladesh. The objectives are to examine and quantify the contribution of supply chain risk factors on completion time of rural road projects and to assess the prioritization of identified risks.

6/18/2020 4:09:32 AM +00:00

Using a metaheuristic algorithm for solving a home health care routing and scheduling problem

This paper aims to develop a mathematical modeling for Home Health Care Routing and Scheduling Problem and to solve it by means of Simulated Annealing (SA) algorithm considering real condition (staff vehicle traveling, conditions of patients and so forth).

6/18/2020 4:09:26 AM +00:00

New procedures with new activity assumptions for solving resource constrained project scheduling problems

The resource-constrained project scheduling problem (RCPSP) is a well-known and widely studied topic. The underlying problem assumes that non-preemptions and that constant resources are restrictions imposed on project activities, which are to be scheduled, subject to precedence relation and limited resource constraints.

6/18/2020 4:09:20 AM +00:00

Servant leadership and its effects on IT project success

Servant Leadership is well known as an employee-oriented leadership style which is used by several major corporations. This work investigates the effects that Servant Leadership may have on the success of Information Technology (IT) projects.

6/18/2020 4:09:14 AM +00:00

Multi objective project portfolio selection

In this paper, we propose a multi - objective model for selecting the project portfolio that maximizes efficiency, quality while minimizes the risk involved in project execution.

6/18/2020 4:09:08 AM +00:00

A new methodology in generating Digital Plants in AVEVA PDMS from Navisworks® model

In this paper, with the development of a new methodology, the non-editable Navisworks® model of phase 1 and 3 of Abadan Oil Refinery was transformed into an editable Digital 3D model in AVEVA PDMS.

6/18/2020 4:09:02 AM +00:00

Critical success factors of ERP implementation in SMEs

This paper is aimed at reviewing present state of the art (1998-March 2019) on the impact of Enterprise Resource Planning (ERP) implementation in Small and Medium Enterprises (SMEs). It includes critical success factors and critical failure factors.

6/18/2020 4:08:56 AM +00:00

Production lessening analysis of manufacturing unit in India: Lean Six Sigma perspective

The primary objective of this research is to find the main reasons of production wastage and recommend corresponding remedies to counter the wastage reasons.

6/18/2020 4:08:50 AM +00:00

Material handling robots fleet size optimization by a heuristic

In order to gain maximum throughput, minimum tardiness from the minimum investment of funds for the material handling activities, it is important to determine the optimum numbers of MHRs required for efficient production of jobs in the FMS.

6/18/2020 4:08:44 AM +00:00

A scientometrics study on green building: A DEA application

This paper presents an application of data envelopment analysis to measure the relative efficiencies of the researches accomplished by various countries around the world on green construction or green management.

6/18/2020 4:08:38 AM +00:00

A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources

In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF).

6/18/2020 4:08:32 AM +00:00