A hybrid algorithm for unrelated parallel machines scheduling
A hybrid algorithm for unrelated parallel machines scheduling
In this paper, a new hybrid algorithm based on multi-objective genetic algorithm (MOGA) using simulated annealing (SA) is proposed for scheduling unrelated parallel machines with sequencedependent setup times, varying due dates, ready times and precedence relations among jobs.